Incoming materials
Material specifications and approved substitutions should be matched to the agreed project schedule.
C—03 / Factory control
Factory capability matters when it is connected to an approved scope, traceable decisions and evidence the project owner can review.


Quality route
Material specifications and approved substitutions should be matched to the agreed project schedule.
The agreed control plan can define dimensional checks and production-stage records to support consistency between modules.
The control plan should define checks for panels, openings, services and finish interfaces against approved drawings and samples.
The agreed handover package should define completion checks, photographs, identification and packing information required before release.
Project quality evidence
The exact inspection and handover package depends on the approved product, destination requirements and agreed project scope. These are the evidence types to establish before production begins.
Drawings, schedules, agreed samples and approved changes establish the reference used for production.
The project quality plan can define dimensional checks, inspection points and photographs required during manufacture.
Final checks can be supported by a completion list, identification record and agreed photo documentation.
Module references, packing information and release status support an orderly handover to the delivery team.
Quality review