FACTORY SUPPLY FROM CHINA · FOR PROJECT BUYERS
Container Site Offices for Construction Projects
Factory-supplied modular site offices and office cabins for contractors and project buyers. Tell us your destination, quantity and required rooms so we can discuss a suitable layout and supply scope.

Glazed Flat Pack Container Office · existing product photograph
02 / SITE OFFICE PROJECTS
What Can a Site Office Include?
Start with the spaces your team needs. These functions can be discussed and configured depending on project requirements; they are not all standard inclusions.
Private Office
Open Workspace
Meeting Room
Duty Room
Staff Rest Area
Toilet / Shower
Kitchen / Pantry
Storage
03 / SITE OFFICE PROJECTS
Real Office Configurations
Compare existing flat pack products as starting points for a construction site office, contractor workspace or office cabin. Room divisions and fittings are confirmed separately.

OFFICE / RECEPTION
Glazed Flat Pack Container Office
Full-height glazing and an open interior provide a reference for an office or reception layout.

PROJECT TEAM WORKSPACE
Glass Facade Flat Pack Container Office
A glazed entrance with solid wall panels offers a different facade and interior arrangement.

DUTY ROOM / STAFF REST
Flat Pack Duty Office and Rest Cabin
Two entrances and an internal partition provide a reference for dividing duty and rest functions.

SEPARATE ROOMS
Two-Room Flat Pack Container House
Discuss the room division and fittings for an office, meeting space or other project use.
Explore the Flat Pack Container House range or all product systems.
04 / SITE OFFICE PROJECTS
Office + Support Facilities
Plan the office cabin with the facilities your team will use. Attached facilities or separate support units can be discussed; connections and the final arrangement depend on your site and scope.

Office + Rest
Discuss a duty office and rest arrangement for shift teams or site staff.

Office + Toilet
Consider a separate toilet support unit, or discuss an integrated layout and service connections.

Office + Kitchen
Use the staff rest cabin with kitchen and toilet as a reference for welfare requirements.

Toilet / Shower Unit
Discuss sanitary facilities, fixture arrangement and water and drainage requirements.
05 / SITE OFFICE PROJECTS
Plan Your Site Office
Send a short project brief so the quotation matches your intended use. Contractors, project owners, EPC and infrastructure buyers, distributors and rental companies can use the same checklist.
Project & Layout
- Quantity and destination country / city / port
- Intended use and number of rooms
- Staff headcount and preferred layout
- Office, meeting, rest, toilet or pantry requirements
- Project start time and required delivery date
Specification & Supply Scope
- Electrical and plumbing requirements
- Insulation, interior finish and local requirements
- Furniture scope, if required
- Packing and delivery scope
- Installation support and site responsibilities
Quotation depends on configuration and project scope. Share any drawings or tender requirements before pricing is finalized.
06 / SITE OFFICE PROJECTS
Layout & Modular Combination

Existing flat pack component diagram — a reference for discussion. Final materials and connections depend on the agreed specification.
From One Module to a Project Layout
A single module can be discussed as an office cabin. A two-room arrangement may separate focused work from meetings, while combined office modules can be reviewed for a larger team.
Tell us whether you need office + meeting, office + rest, or office + welfare facilities. Door positions, partitions, circulation and service connections should follow the agreed layout.
Two-storey configurations can be discussed subject to structural and project requirements. Local design, approval and site requirements need review before any commitment.
07 / SITE OFFICE PROJECTS
Packing, Delivery & Installation

Factory packing reference. Packing for your selected office configuration is confirmed separately.
Agree the Handover Before Production
- Factory preparation: confirm drawings, components, finishes and agreed inspection items.
- Packing and loading: plan protection and shipment around the configuration and quantity.
- Destination-based shipping: confirm port or site destination, delivery terms and local transport scope.
- Site readiness: allocate unloading, access, foundations, utility connections and local site responsibilities.
- Installation support: confirm drawings, guidance and any other support per project.
For a portable site office project, also tell us about planned relocation and handling needs so these can be reviewed.
08 / SITE OFFICE PROJECTS
Factory & Quality
Verify the supplier and the agreed specification before ordering. Review the production facility, workshop, inspection arrangements and selected company documentation with our team.

Production & Project Preparation
Discuss the production sequence, material specification, inspection checkpoints and packing records relevant to your order.

Selected Company Documents
Selected company certificates or patents are shown for supplier review. Ask us to confirm their scope, validity and relevance to the selected configuration.
09 / SITE OFFICE PROJECTS
Site Office Procurement FAQ
Can the office layout be customized?
Share a sketch, room list and staff headcount. We can discuss partitions, doors, windows, insulation and finishes against the selected module and project requirements. The final layout and supply scope need written confirmation.
Can a meeting room or toilet be included?
A container office with a meeting room, a site office with a toilet, or separate welfare units can be discussed. Tell us the required rooms and available space. Plumbing, drainage, ventilation and electrical scope must be agreed for the project.
What information is needed for a quotation?
Send the destination country and city or port, intended use, quantity, room or layout requirements, staff headcount and project start time. Add drawings, electrical and plumbing needs, finish preferences and the delivery or installation support you require.
Can multiple modules be combined?
Combined office modules can be discussed for workspace, meetings or rest facilities. Connections and the final arrangement depend on engineering review and site requirements. Two-storey configurations can be discussed subject to structural and project requirements.
How are units packed and delivered?
Packing and loading are planned for the selected system, quantity and agreed scope. Shipping is discussed against the destination and delivery terms. Confirm customs, local transport, unloading equipment and access before ordering.
Is installation support available?
Ask us to confirm the support available for your chosen configuration, such as drawings, assembly guidance or other agreed assistance. Local foundations, unloading, labour, equipment, utilities and site responsibilities must be clearly allocated before supply.
Can I order a pilot or single unit?
Send the configuration, quantity and destination for review. Availability, minimum order requirements, packing and shipping costs need to be confirmed for the specific request.
10 / SITE OFFICE PROJECTS
Plan Your Site Office Project
Tell us where the site office will be used and what your team needs. Include these five essentials in the project message below.
Your Project Brief
Destination: country, city or port
Use: construction office / duty room / rental fleet / other
Quantity: units required
Layout / Rooms: office, meeting, rest, kitchen, toilet or shower; staff headcount
Timeline: project start and required delivery
Add your preferred layout, installation assistance and delivery scope. Email drawings or reference files if available.